At Light Up Naples Holiday & Outdoor Lighting, a family-owned company serving Naples, Bonita Springs, Estero, Fort Myers, and Marco Island, we answer this question for homeowners and HOA boards who plan to hire a professional. Knowing the timeline is the first step in planning a display for your property.
Most professional holiday displays take less than a day for a small crew, and larger or more elaborate ones may need a bigger team or several days. Roofline length, property size, palm trees, and design complexity set the pace. Our residential work begins in October, with a second visit in November.
TL;DR
- Most holiday displays take less than a day for a small crew. Larger or more elaborate displays may need a bigger team or several days.
- Our residential installations begin in October, with a second visit in November. HOA and community entrances can start as early as September.
- Roofline length, property size, palm trees, and design complexity set the pace.
- Takedown happens in January, with packing and off-season storage.
How Many Days Does Installation Take on Site?
Most holiday displays take less than a day for a small crew, and larger or more elaborate displays may need a bigger team or several days. A property with a long roofline, a line of palms, or an elaborate design belongs in the second group.
The exact number depends on the property, because we build every layout around the specific home. That range covers time on site only. A design walk, a custom proposal, and a confirmed date all come first.
For residential projects, the crew returns in November. On that second visit, we hung wreaths and garland, set the timers, and plug everything in. Our project process covers every step from the first walk-through to takedown.
What Factors Decide How Many Days Your Installation Needs?

Four factors set the schedule: roofline length, property size and layout, palm trees, and design complexity. We walk the property and build each layout around the specific home.
How Do Roofline Length and Pitch Change the Schedule?
Our roofline lighting is custom cut to the exact pitch and length of each roofline. A longer or more complex roofline therefore means more custom-cut lighting to place. We build the layout after walking the property, so the measurements come from your home, not from a standard package.
How Much Do Palm Trees Add to an Installation?
Every palm is sized individually. We measure palm wraps to the height and trunk diameter of each tree, so a long line of palms along a driveway carries more individual wraps than a pair at the entry.
For palm tree lighting, we use two methods. Wrapping places lights directly around the trunk. Uplighting uses ground-level fixtures to cast light upward into the trunk and canopy. The two methods can be combined in a single design.
How Does Design Complexity Affect the Timeline?
Each element added to the design adds work. Our displays can include grand entrance garland fitted to columns, gates, or the front door frame; wreaths and garland hung during the November visit; and programmed timing and transitions. Color-changing and themed displays are part of our service as well.
A restrained roofline-and-palms design finishes sooner than a full-property display with several focal points.
What Happens From Your First Call Until the Lights Come On?

Every Christmas light installation in Naples project follows four steps:
- Free design walk. We walk your property and plan the display.
- Custom proposal. We send an itemized proposal, and you confirm your date.
- Professional installation. Our crew installs the approved design.
- Service and takedown. We maintain the display through the season and remove it in January.
What Happens Before Installation Day?
Before we install a single bulb, Katie and Peter O’Flinn walk your property. Our designers can meet you at your home or at our showroom. We then send a fully itemized proposal by text or email. You select your options in our online quote, submit a deposit, and secure a place on our schedule.
None of this work counts toward the days on site, which is why the full timeline from first call to lights on is longer than the installation itself.
What Happens on Installation Day?
Our trained in-house crew installs the approved design on your property. For residential projects, the main installation begins in October, and the second visit in November finishes the display.
The crew needs access to power. Electrical Safety Foundation International recommends plugging outdoor lighting into circuits protected by ground fault circuit interrupters (GFCIs), so we run displays from your existing exterior outlets and plan the layout around them. Point out your exterior outlets during the design walk so the plan accounts for them.
How Long Does an HOA Entrance or Clubhouse Installation Take?
HOA and community installations are scheduled earlier than residential ones, often starting as early as September, and the duration depends on the scale of the display. We collaborate with each HOA or community to plan the design.
Scale varies widely. Our Riverstone entrance carries more than 10,000 lights across a 30-foot waterfall monument. We regularly work with HOA boards, property managers, and community associations. Our HOA entrance and clubhouse lighting service covers entrances, gatehouses, clubhouses, and streetscapes.
Board approvals shape the calendar as much as crew time does. Our HOA planning timeline advises boards to plan six to nine months before installation, with the cycle running from a spring budget line through summer bids to a vendor contract by September. It also notes that entrance and clubhouse bids take longer to clear than other items.
We serve communities including Port Royal, Pelican Bay, Grey Oaks, Quail West, Bonita Bay, and Park Shore.
How Does the Season Calendar Shape Your Installation Date?
Our season runs in a fixed sequence: community entrances as early as September, residential homes in October, a second residential visit in November, and takedown in January.
| Stage | When | What happens |
| HOA and community entrances | As early as September | Entrance and clubhouse displays go up |
| Residential homes | October | Main installation of the approved design |
| Residential second visit | November | Wreaths and garland hung, timers set, everything plugged in |
| In-season service | Throughout the season | Storm, landscaper, or rodent damage repaired within 24 hours |
| Takedown | January | Decorations removed, packed, and stored |
Large estates are scheduled according to project size and preferred dates. Our booking guide recommends booking several months before you want the display installed, and it names summer or early fall as a practical target for most homes.
What Can Delay a Christmas Light Installation in Naples?
Late booking and community approval cycles both push installation dates later. Reservations made in October and November depend on the schedule that remains, as our booking guide notes, and waiting until November may limit your options.
Approvals work the same way. Some boards raise holiday lighting for the first time at their October meeting, which our HOA planning timeline lists as a common timing mistake. A vendor contract signed by September secures the installation window before the fall rush.
What Happens After Installation Day Through Takedown?
Maintenance runs through the entire season, and takedown takes place in January. For residential projects, when storms, landscapers, or rodents damage lights or wires, we are on site within 24 hours to make repairs.
In January, we take the decorations down and store them in our warehouses. Maintenance, storm repairs, January takedown, and off-season storage are all included in the residential agreement.
Frequently Asked Questions
How long does it take to install Christmas lights on a house?
Most holiday displays take less than a day for a small crew, and larger or more elaborate displays may need a bigger team or several days. Residential projects with us also include a second visit in November.
Does installation happen in one visit?
For residential projects, no. The main installation begins in October. A second visit in November adds wreaths and garland, sets the timers, and plugs everything in.
How far in advance should I schedule a Christmas light installation?
Book several months before you want the display installed. Summer or early fall is a practical target for most homes. HOA boards should plan six to nine months before installation.
Can I still book an installation in October or November?
Yes, as availability allows. Reservations in October and November depend on the remaining installation schedule, and waiting until November may limit your options. Call (239) 228-8700 to check open dates.
Does the installation time change for larger properties?
Yes. Every layout is built for the specific property, and larger or more elaborate displays may need a bigger team or several days. Large estates are scheduled by project size and preferred dates.
When does takedown happen?
Takedown happens in January. We pack the decorations and store them in our warehouses until next season.
Ready to Secure Your Installation Date?
Light Up Naples Holiday & Outdoor Lighting is rated 5 stars on Google with over 50 reviews. Call (239) 228-8700 or schedule your free design walk online to get on the schedule.